WA HVAC

PO-26-0810 · Reece HVAC-R

Job J-26-0184 — Units 1–14, Bibra Lake — admin building ducted AC replacement
MYOB · synced 09:14 Demo 08 Oct 2026
Received
Received 05 Jun 2026
Deliver to: Site: Units 1–14, Bibra Lake · in MYOB 04 Jun 2026 · 16:49
Open job J-26-0184
WA HVAC — Specialising in Mining & Resources
WA HVAC Pty Ltd
1/9 Blackly Row, Cockburn Central WA 6164 · 08 9314 7696 · admin@wahvac.com.au
ABN 49 629 340 405 · Refrigerant Trading Authorisation AU42942 · Electrical Contractor EC10155
Purchase order
PO-26-0810
Date 04 Jun 2026
Required by 05 Jun 2026
Our account WAHV01
Job J-26-0184
Supplier
Reece HVAC-R
Welshpool branch
welshpool.hvacr@reece.com.au
08 9351 2700
Received
CodeDescriptionQtyUnitTotal
CU-PR3858Pre-insulated pair coil 3/8" + 5/8" × 20 m2 coil$342.00$684.00
INS-DUCTR1Duct insulation blanket R1.0 × 15 m roll2 roll$112.00$224.00
DU-MASTICDuct mastic & foil tape kit6 kit$22.00$132.00
MS-PADSAnti-vibration pads (set of 4)2 set$22.00$44.00
MS-DRAINCondensate drain 20 mm PVC + fittings2 set$28.00$56.00
MS-SUNDFixings & sundries allowance3 lot$35.00$105.00
Subtotal (ex GST)$1,245.00
GST 10%$124.50
Total (inc GST)$1,369.50
Deliver to: Site: Units 1–14, Bibra Lake Please quote PO-26-0810 and job J-26-0184 on your delivery docket and invoice.
Heating · Ventilation · Air Conditioning · Refrigeration · Maintenance