Accepted
Accepted 27 Aug 2026 — job J-26-0224 raised
KCGM Fimiston — mill & workshops · Goldfields · Kalgoorlie · from ENQ-1182 · prepared by Michelle
Cost
$42,419
192 labour hrs · $14,180
Price ex GST
$59,691
15 lines · 2 groups
Margin
$17,273
28.9% of price
Total inc GST
$65,660
GST $5,969.10
Bill of materials & labour Accepted
| Item | Qty | Unit | Unit cost | Markup | Unit sell | Line | |
|---|---|---|---|---|---|---|---|
| Switchroom cooling — 2 × 7.1 kW duty/standby × 5 | $53,451 | ||||||
| MEA-MSZAP71 Mitsubishi Electric 7.1 kW wall split (MSZ-AP71VG) | 10 | ea | $2,040.00 | 25% | $2,550.00 | $25,500.00 | |
| CU-PR1438 Pre-insulated pair coil 1/4" + 3/8" × 20 m | 10 | coil | $238.00 | 35% | $321.30 | $3,213.00 | |
| MS-BRK750 Wall bracket 750 mm heavy duty, galv | 10 | pr | $48.00 | 35% | $64.80 | $648.00 | |
| MS-PADS Anti-vibration pads (set of 4) | 10 | set | $22.00 | 35% | $29.70 | $297.00 | |
| EL-ISO20 Isolator 20 A 2-pole IP66 | 10 | ea | $36.00 | 35% | $48.60 | $486.00 | |
| EL-IC415 Interconnect cable 4C 1.5 mm² | 150 | m | $2.29 | 40% | $3.21 | $481.50 | |
| EL-CON25 Conduit 25 mm × 4 m + saddles | 30 | length | $7.50 | 40% | $10.50 | $315.00 | |
| CT-DUTY Duty / standby changeover controller with alarm relay | 5 | ea | $640.00 | 30% | $832.00 | $4,160.00 | |
| MS-DRAIN Condensate drain 20 mm PVC + fittings | 10 | set | $28.00 | 35% | $37.80 | $378.00 | |
| MS-SUND Fixings & sundries allowance | 10 | lot | $35.00 | 35% | $47.25 | $472.50 | |
| LAB-MECH Refrigeration mechanic | 70 | hr | $72.00 | 73.6% | $125.00 | $8,750.00 | |
| LAB-APP Apprentice | 50 | hr | $38.00 | 97.4% | $75.00 | $3,750.00 | |
| LAB-ELEC Electrician | 40 | hr | $76.00 | 64.5% | $125.00 | $5,000.00 | |
| Regional mobilisation — 2-person crew × 2 | $6,240 | ||||||
| TRV-TIME Travel time — regional (per person) | 32 | hr | $60.00 | 50% | $90.00 | $2,880.00 | |
| TRV-KM Service vehicle — regional travel | 2,400 | km | $0.95 | 47.4% | $1.40 | $3,360.00 | |
Scope & exclusions
Supply, install and commission as per the line items. Includes electrical isolation, refrigerant charge, testing and a commissioning report.
Exclusions: Builder's works, penetrations through fire-rated elements, after-hours work unless noted, structural certification. Flights and camp accommodation supplied by client on remote sites.
Client & site
- Client
- Northern Star Resources
- Contact
- Kirsty Hamlyn · 08 6188 2100
- Site
- KCGM Fimiston — mill & workshops
- Access
- DIDO from Kalgoorlie · KCGM induction
- Terms
- 30 days EOM
- Priced on
- 21 Aug 2026