Accepted
Accepted 25 Sep 2026 — job J-26-0235 raised
Kwinana fabrication facility · Kwinana · prepared by Michelle
Cost
$9,413
36 labour hrs · $2,064
Price ex GST
$12,877
17 lines · 1 groups
Margin
$3,464
26.9% of price
Total inc GST
$14,165
GST $1,287.71
Bill of materials & labour Accepted
| Item | Qty | Unit | Unit cost | Markup | Unit sell | Line | |
|---|---|---|---|---|---|---|---|
| Ducted split 14 kW — supply & install | $12,877 | ||||||
| DAI-FDYAN140 Daikin 14.0 kW ducted split inverter, 1-ph (FDYAN140) | 1 | ea | $5,650.00 | 22% | $6,893.00 | $6,893.00 | |
| CU-PR3858 Pre-insulated pair coil 3/8" + 5/8" × 20 m | 1 | coil | $342.00 | 35% | $461.70 | $461.70 | |
| EL-IC415 Interconnect cable 4C 1.5 mm² | 25 | m | $2.29 | 40% | $3.21 | $80.25 | |
| EL-ISO20 Isolator 20 A 2-pole IP66 | 1 | ea | $36.00 | 35% | $48.60 | $48.60 | |
| MS-PADS Anti-vibration pads (set of 4) | 1 | set | $22.00 | 35% | $29.70 | $29.70 | |
| MS-DRAIN Condensate drain 20 mm PVC + fittings | 1 | set | $28.00 | 35% | $37.80 | $37.80 | |
| DU-DIF450 Ceiling diffuser 4-way 450 sq. with plenum | 6 | ea | $46.00 | 35% | $62.10 | $372.60 | |
| DU-RAG600 Return air grille 600 × 600 with filter | 1 | ea | $74.00 | 35% | $99.90 | $99.90 | |
| DU-FLX250 Insulated flexible duct 250 mm × 6 m | 6 | length | $72.00 | 35% | $97.20 | $583.20 | |
| DU-SPG250 Spigot collar 250 mm with damper | 6 | ea | $18.00 | 35% | $24.30 | $145.80 | |
| DU-MASTIC Duct mastic & foil tape kit | 2 | kit | $22.00 | 35% | $29.70 | $59.40 | |
| CT-BRC1H Daikin wired controller (BRC1H) | 1 | ea | $220.00 | 30% | $286.00 | $286.00 | |
| RG-N2-G Dry nitrogen — G size cylinder | 0.25 | cyl | $98.00 | 30% | $127.40 | $31.85 | |
| MS-SUND Fixings & sundries allowance | 1 | lot | $35.00 | 35% | $47.25 | $47.25 | |
| LAB-MECH Refrigeration mechanic | 16 | hr | $72.00 | 73.6% | $125.00 | $2,000.00 | |
| LAB-APP Apprentice | 16 | hr | $38.00 | 97.4% | $75.00 | $1,200.00 | |
| LAB-ELEC Electrician | 4 | hr | $76.00 | 64.5% | $125.00 | $500.00 | |
Scope & exclusions
Supply, install and commission as per the line items. Includes electrical isolation, refrigerant charge, testing and a commissioning report.
Exclusions: Builder's works, penetrations through fire-rated elements, after-hours work unless noted, structural certification. Flights and camp accommodation supplied by client on remote sites.
Client & site
- Client
- Monadelphous Engineering
- Contact
- Craig Ellery · 08 9316 1255
- Site
- Kwinana fabrication facility
- Access
- Site induction · PPE
- Terms
- 45 days EOM
- Priced on
- 18 Sep 2026