WA HVAC

PO-26-0681 · Reece HVAC-R

Job J-25-0121 — Kwinana fabrication facility — office cassette units
MYOB · synced 09:14 Demo 08 Oct 2026
Received
Received 05 Jan 2026
Deliver to: Site: Kwinana fabrication facility · in MYOB 04 Jan 2026 · 16:54
Open job J-25-0121
WA HVAC — Specialising in Mining & Resources
WA HVAC Pty Ltd
1/9 Blackly Row, Cockburn Central WA 6164 · 08 9314 7696 · admin@wahvac.com.au
ABN 49 629 340 405 · Refrigerant Trading Authorisation AU42942 · Electrical Contractor EC10155
Purchase order
PO-26-0681
Date 04 Jan 2026
Required by 05 Jan 2026
Our account WAHV01
Job J-25-0121
Supplier
Reece HVAC-R
Welshpool branch
welshpool.hvacr@reece.com.au
08 9351 2700
Received
CodeDescriptionQtyUnitTotal
CU-PR3858Pre-insulated pair coil 3/8" + 5/8" × 20 m4 coil$327.27$1,309.08
MS-PADSAnti-vibration pads (set of 4)4 set$22.00$88.00
MS-CPUMPCondensate pump (mini)4 ea$128.00$512.00
MS-DRAINCondensate drain 20 mm PVC + fittings4 set$28.00$112.00
MS-SUNDFixings & sundries allowance4 lot$35.00$140.00
Subtotal (ex GST)$2,161.08
GST 10%$216.11
Total (inc GST)$2,377.19
Deliver to: Site: Kwinana fabrication facility Please quote PO-26-0681 and job J-25-0121 on your delivery docket and invoice.
Heating · Ventilation · Air Conditioning · Refrigeration · Maintenance