WA HVAC

PO-26-0897 · Holyoake

Job J-26-0230 — Control room & labs — ducted 20 kW and duct mods
MYOB · synced 09:14 Demo 08 Oct 2026
Received
Received 27 Sep 2026
Deliver to: Site: Kwinana — control room & labs · in MYOB 22 Sep 2026 · 16:48
Open job J-26-0230
WA HVAC — Specialising in Mining & Resources
WA HVAC Pty Ltd
1/9 Blackly Row, Cockburn Central WA 6164 · 08 9314 7696 · admin@wahvac.com.au
ABN 49 629 340 405 · Refrigerant Trading Authorisation AU42942 · Electrical Contractor EC10155
Purchase order
PO-26-0897
Date 22 Sep 2026
Required by 27 Sep 2026
Our account HOL-6610
Job J-26-0230
Supplier
Holyoake
Malaga branch
wa@holyoake.com
08 9209 2733
Received
CodeDescriptionQtyUnitTotal
DU-FLX250Insulated flexible duct 250 mm × 6 m8 length$72.00$576.00
DU-DIF450Ceiling diffuser 4-way 450 sq. with plenum8 ea$46.00$368.00
DU-RAG600Return air grille 600 × 600 with filter2 ea$74.00$148.00
DU-SPG250Spigot collar 250 mm with damper8 ea$18.00$144.00
DU-VCD300Volume control damper 300 × 3003 ea$48.00$144.00
Subtotal (ex GST)$1,380.00
GST 10%$138.00
Total (inc GST)$1,518.00
Deliver to: Site: Kwinana — control room & labs Please quote PO-26-0897 and job J-26-0230 on your delivery docket and invoice.
Heating · Ventilation · Air Conditioning · Refrigeration · Maintenance