WA HVAC

PO-25-0622 · Reece HVAC-R

Job J-25-0105 — St Ives gold mine — workshop exhaust & cooling
MYOB · synced 09:14 Demo 08 Oct 2026
Received
Received 25 Oct 2025
Deliver to: WA HVAC — Cockburn Central (consolidate for site freight) · in MYOB 24 Oct 2025 · 16:54
Open job J-25-0105
WA HVAC — Specialising in Mining & Resources
WA HVAC Pty Ltd
1/9 Blackly Row, Cockburn Central WA 6164 · 08 9314 7696 · admin@wahvac.com.au
ABN 49 629 340 405 · Refrigerant Trading Authorisation AU42942 · Electrical Contractor EC10155
Purchase order
PO-25-0622
Date 24 Oct 2025
Required by 25 Oct 2025
Our account WAHV01
Job J-25-0105
Supplier
Reece HVAC-R
Welshpool branch
welshpool.hvacr@reece.com.au
08 9351 2700
Received
CodeDescriptionQtyUnitTotal
CU-PR1438Pre-insulated pair coil 1/4" + 3/8" × 20 m4 coil$227.75$911.00
MS-BRK750Wall bracket 750 mm heavy duty, galv4 pr$48.00$192.00
MS-PADSAnti-vibration pads (set of 4)4 set$22.00$88.00
MS-DRAINCondensate drain 20 mm PVC + fittings4 set$28.00$112.00
MS-SUNDFixings & sundries allowance8 lot$35.00$280.00
Subtotal (ex GST)$1,583.00
GST 10%$158.30
Total (inc GST)$1,741.30
Deliver to: WA HVAC — Cockburn Central (consolidate for site freight) Please quote PO-25-0622 and job J-25-0105 on your delivery docket and invoice.
Heating · Ventilation · Air Conditioning · Refrigeration · Maintenance