Commissioning · 92% complete
Lead: Liam O'Brien · due 12 Oct 2026
18 Sep 2026 → 12 Oct 2026 · order PO-NOV-77120 · from EST-26-0282 Rev A
Budget against actualOn track
Job value
$32,477
ex GST
Budget cost
$22,951
margin 29%
Actual to date
$21,769
101 of 110 hrs
Forecast margin
$9,417
29% · $110 over budget
Dark = spent (POs sent + timesheets at cost) · light = forecast to finish · line = budget from the estimate.
Site
- Client
- IGO Limited
- Site
- Nova operation
- Region
- Fraser Range · 160 km E of Norseman
- Access
- FIFO 8/6 · Nova induction
- Site contact
- Natalie Dorsett 08 9238 8300
- Lead tech
- Liam O'Brien
- MYOB job
- J-26-0222 in MYOB
Materials — from the estimate (18)
| Code | Description | Qty | Unit | Supplier | Budget | At today's price | Status | PO | |
|---|---|---|---|---|---|---|---|---|---|
| RG-R448-10 | Refrigerant R448A — 10 kg cylinder | 1.6 | cyl | Actrol | $914 | $0 | Received | PO-26-0888 | |
| RG-N2-G | Dry nitrogen — G size cylinder | 1 | cyl | BOC Gas & Gear | $98 | $0 | Received | PO-26-0892 | |
| RG-BRZ15 | Silver brazing rod 15% — 1 kg | 0.65 | pack | BOC Gas & Gear | $107 | $0 | Received | PO-26-0892 | |
| HC-LET068 | Heatcraft condensing unit 1.5 HP medium temp (R448A) | 1 | ea | Heatcraft Australia | $3,180 | $0 | Received | PO-26-0890 | |
| HC-LET150 | Heatcraft condensing unit 3.5 HP low temp (R448A) | 1 | ea | Heatcraft Australia | $5,960 | $0 | Received | PO-26-0890 | |
| KB-EVMT26 | Kirby coolroom evaporator, medium temp 2.6 kW | 1 | ea | Kirby Refrigeration | $1,240 | $0 | Received | PO-26-0889 | |
| KB-EVLT30 | Kirby freezer evaporator, low temp 3.0 kW electric defrost | 1 | ea | Kirby Refrigeration | $1,980 | $0 | Received | PO-26-0889 | |
| CT-XR60 | Dixell XR60CX coolroom controller kit | 2 | ea | Kirby Refrigeration | $620 | $0 | Received | PO-26-0889 | |
| CU-C38-15 | Copper tube 3/8" soft coil × 15 m | 2 | coil | Reece HVAC-R | $216 | $0 | Received | PO-26-0887 | |
| CU-C58-15 | Copper tube 5/8" soft coil × 15 m | 1 | coil | Reece HVAC-R | $188 | $0 | Received | PO-26-0887 | |
| CU-H78-58 | Copper tube 7/8" hard drawn × 5.8 m | 2 | length | Reece HVAC-R | $256 | $0 | Received | PO-26-0887 | |
| CU-FIT-PK | Copper fittings pack — elbows, couplers, tees | 3 | pack | Reece HVAC-R | $174 | $0 | Received | PO-26-0887 | |
| INS-AF58 | Armaflex 5/8" ID × 19 mm × 1.8 m | 18 | length | Reece HVAC-R | $180 | $0 | Received | PO-26-0887 | |
| MS-SUND | Fixings & sundries allowance | 2 | lot | Reece HVAC-R | $70 | $0 | Received | PO-26-0887 | |
| EL-ISO20 | Isolator 20 A 2-pole IP66 | 1 | ea | Rexel Electrical | $36 | $0 | Received | PO-26-0891 | |
| EL-ISO35 | Isolator 35 A 3-pole IP66 | 1 | ea | Rexel Electrical | $58 | $0 | Received | PO-26-0891 | |
| EL-IC415 | Interconnect cable 4C 1.5 mm² | 20 | m | Rexel Electrical | $46 | $0 | Received | PO-26-0891 | |
| EL-5C4 | 4 mm² 5-core circular cable | 25 | m | Rexel Electrical | $148 | $0 | Received | PO-26-0891 | |
Purchase orders (6)All POs →
Invoices$0 of $32,477
Not invoiced yet.
Timesheets — 101 hrs · $6,188 at cost
| Date | Who | Hours | Cost | Note | |
|---|---|---|---|---|---|
| 22 Sep 2026 | Sam Nguyen | 0 | $0 | — | |
| 22 Sep 2026 | Tayla Brooks | 0 | $0 | — | |
| 22 Sep 2026 | Liam O'Brien | 1 | $74 | — | |
| 21 Sep 2026 | Sam Nguyen | 7 | $532 | — | |
| 21 Sep 2026 | Tayla Brooks | 10 | $380 | — | |
| 21 Sep 2026 | Liam O'Brien | 10 | $740 | — | |
| 21 Sep 2026 | Sam Nguyen | 5 | $380 | — | |
| 21 Sep 2026 | Tayla Brooks | 8 | $304 | — | |
| 21 Sep 2026 | Liam O'Brien | 10 | $740 | — | |
| 21 Sep 2026 | Sam Nguyen | 5 | $380 | — | |
| 21 Sep 2026 | Tayla Brooks | 8 | $304 | — | |
| 21 Sep 2026 | Liam O'Brien | 10 | $740 | — | |
| 18 Sep 2026 | Sam Nguyen | 6 | $456 | Mobilise, set out | |
| 18 Sep 2026 | Tayla Brooks | 11 | $418 | Mobilise, set out | |
| 18 Sep 2026 | Liam O'Brien | 10 | $740 | Mobilise, set out | |