WA HVAC

EST-26-0283 Rev A

Coogee Chemicals · Kwinana — donga AC changeover
MYOB · synced 09:14 Demo 08 Oct 2026
Accepted
Accepted 23 Aug 2026 — job J-26-0221 raised
Kwinana — switchrooms & office · Kwinana · prepared by Michelle
Cost
$16,282
72 labour hrs · $3,960
Price ex GST
$22,934
9 lines · 1 groups
Margin
$6,652
29% of price
Total inc GST
$25,227
GST $2,293.39
Bill of materials & labour Accepted
ItemQtyUnitUnit costMarkupUnit sellLine
Donga / transportable split 2.5 kW — per room × 12$22,934
DAI-FTXF25
Daikin 2.5 kW wall split — transportable/donga (FTXF25)
12 ea $760.00 25% $950.00 $11,400.00
CU-PR1438
Pre-insulated pair coil 1/4" + 3/8" × 20 m
6 coil $238.00 35% $321.30 $1,927.80
MS-BRK750
Wall bracket 750 mm heavy duty, galv
12 pr $48.00 35% $64.80 $777.60
EL-ISO20
Isolator 20 A 2-pole IP66
12 ea $36.00 35% $48.60 $583.20
EL-IC415
Interconnect cable 4C 1.5 mm²
96 m $2.29 40% $3.21 $308.16
MS-DRAIN
Condensate drain 20 mm PVC + fittings
12 set $28.00 35% $37.80 $453.60
MS-SUND
Fixings & sundries allowance
6 lot $35.00 35% $47.25 $283.50
LAB-MECH
Refrigeration mechanic
36 hr $72.00 73.6% $125.00 $4,500.00
LAB-APP
Apprentice
36 hr $38.00 97.4% $75.00 $2,700.00
Scope & exclusions
Supply, install and commission as per the line items. Includes electrical isolation, refrigerant charge, testing and a commissioning report.
Exclusions: Builder's works, penetrations through fire-rated elements, after-hours work unless noted, structural certification. Flights and camp accommodation supplied by client on remote sites.
Client & site
Client
Coogee Chemicals
Contact
Michael Tan · 08 9439 8200
Site
Kwinana — switchrooms & office
Access
Site induction · hot work permit
Terms
30 days EOM
Priced on
18 Aug 2026