WA HVAC

Quotation EST-26-0259

Roy Hill Holdings
MYOB · synced 09:14 Demo 08 Oct 2026
← Back to estimate
WA HVAC — Specialising in Mining & Resources
WA HVAC Pty Ltd
1/9 Blackly Row, Cockburn Central WA 6164 · 08 9314 7696 · admin@wahvac.com.au
ABN 49 629 340 405 · Refrigerant Trading Authorisation AU42942 · Electrical Contractor EC10155
Quotation
EST-26-0259 Rev A
Date 26 May 2026
Valid until 25 Jun 2026
Prepared by Michelle
Prepared for
Roy Hill Holdings
Attn: Brendan Clancy
brendan.clancy@royhill.com.au
ABN 21 123 722 237
Site
Roy Hill mine — process plant
Pilbara · 115 km N of Newman
Roy Hill mine — donga AC changeover
DescriptionAmount ex GST
Donga / transportable split 2.5 kW — per room × 12
12 × Daikin 2.5 kW wall split — transportable/donga (FTXF25) · 6 × Pre-insulated pair coil 1/4" + 3/8" × 20 m · 12 × Wall bracket 750 mm heavy duty, galv · 12 × Isolator 20 A 2-pole IP66 · 96 × Interconnect cable 4C 1.5 mm² · 12 × Condensate drain 20 mm PVC + fittings · 6 × Fixings & sundries allowance · Installation, testing & commissioning (72 hrs)
$22,601.82
Regional mobilisation — 2-person crew
· Installation, testing & commissioning (16 hrs)
$3,120.00
Subtotal (ex GST)$25,721.82
GST 10%$2,572.18
Total (inc GST)$28,294.00
This quotation is valid for 30 days. Prices are based on supplier costs on 24 May 2026. Exclusions: Builder's works, penetrations through fire-rated elements, after-hours work unless noted, structural certification. Flights and camp accommodation supplied by client on remote sites. Payment terms per our account terms. All work carried out by ARCtick-licensed technicians under RTA AU42942 and EC10155.
Heating · Ventilation · Air Conditioning · Refrigeration · Maintenance