EST-25-0213 Rev A

Ramelius Resources · Mt Magnet gold project — training room ducted AC
MYOB · synced 09:14 Demo 08 Oct 2026
Accepted
Accepted 15 Dec 2025 — job J-25-0118 raised
Mt Magnet gold project · Murchison · Mt Magnet · prepared by Michelle
Cost
$16,876
72 labour hrs · $5,348
Price ex GST
$23,378
20 lines · 2 groups
Margin
$6,502
27.8% of price
Total inc GST
$25,716
GST $2,337.83
Bill of materials & labour Accepted
ItemQtyUnitUnit costMarkupUnit sellLine
Ducted split 20 kW 3-phase — supply & install$20,258
DAI-FDYQ200
Daikin 20.0 kW ducted split inverter, 3-ph (FDYQ200)
1 ea $8,174.76 22% $9,973.21 $9,973.21
CU-PR3858
Pre-insulated pair coil 3/8" + 5/8" × 20 m
2 coil $327.27 35% $441.81 $883.62
EL-IC415
Interconnect cable 4C 1.5 mm²
30 m $2.29 40% $3.21 $96.30
EL-ISO35
Isolator 35 A 3-pole IP66
1 ea $58.00 35% $78.30 $78.30
EL-5C4
4 mm² 5-core circular cable
20 m $5.90 35% $7.97 $159.40
MS-STAND
Galvanised roof stand / plinth
1 ea $145.00 35% $195.75 $195.75
MS-DRAIN
Condensate drain 20 mm PVC + fittings
1 set $28.00 35% $37.80 $37.80
DU-DIF450
Ceiling diffuser 4-way 450 sq. with plenum
8 ea $46.00 35% $62.10 $496.80
DU-RAG600
Return air grille 600 × 600 with filter
2 ea $74.00 35% $99.90 $199.80
DU-FLX250
Insulated flexible duct 250 mm × 6 m
8 length $72.00 35% $97.20 $777.60
DU-SPG250
Spigot collar 250 mm with damper
8 ea $18.00 35% $24.30 $194.40
DU-MASTIC
Duct mastic & foil tape kit
3 kit $22.00 35% $29.70 $89.10
CT-ZONE4
4-zone control system with touch screen
1 ea $860.00 30% $1,118.00 $1,118.00
RG-N2-G
Dry nitrogen — G size cylinder
0.5 cyl $98.00 30% $127.40 $63.70
MS-SUND
Fixings & sundries allowance
2 lot $35.00 35% $47.25 $94.50
LAB-MECH
Refrigeration mechanic
24 hr $72.00 73.6% $125.00 $3,000.00
LAB-APP
Apprentice
24 hr $38.00 97.4% $75.00 $1,800.00
LAB-ELEC
Electrician
8 hr $76.00 64.5% $125.00 $1,000.00
Regional mobilisation — 2-person crew$3,120
TRV-TIME
Travel time — regional (per person)
16 hr $60.00 50% $90.00 $1,440.00
TRV-KM
Service vehicle — regional travel
1,200 km $0.95 47.4% $1.40 $1,680.00
Scope & exclusions
Supply, install and commission as per the line items. Includes electrical isolation, refrigerant charge, testing and a commissioning report.
Exclusions: Builder's works, penetrations through fire-rated elements, after-hours work unless noted, structural certification. Flights and camp accommodation supplied by client on remote sites.
Client & site
Client
Ramelius Resources
Contact
Hayden Price · 08 9202 1127
Site
Mt Magnet gold project
Access
FIFO 8/6 · site induction
Terms
30 days EOM
Priced on
08 Dec 2025