WA HVAC

Quotation EST-26-0234

Civeo
MYOB · synced 09:14 Demo 08 Oct 2026
← Back to estimate
WA HVAC — Specialising in Mining & Resources
WA HVAC Pty Ltd
1/9 Blackly Row, Cockburn Central WA 6164 · 08 9314 7696 · admin@wahvac.com.au
ABN 49 629 340 405 · Refrigerant Trading Authorisation AU42942 · Electrical Contractor EC10155
Quotation
EST-26-0234 Rev A
Date 22 Feb 2026
Valid until 24 Mar 2026
Prepared by Michelle
Prepared for
Civeo
Attn: Shane Mathers
shane.mathers@civeo.com
ABN 88 157 497 845
Site
Kambalda Village
Goldfields · Kambalda
Kambalda Village — crib room wall splits
DescriptionAmount ex GST
Wall split 7.1 kW — back-to-back install × 3
3 × Daikin 7.1 kW wall split inverter (FTXM71) · 3 × Pre-insulated pair coil 1/4" + 3/8" × 20 m · 3 × Wall bracket 750 mm heavy duty, galv · 3 × Anti-vibration pads (set of 4) · 3 × Isolator 20 A 2-pole IP66 · 36 × Interconnect cable 4C 1.5 mm² · 3 × Condensate drain 20 mm PVC + fittings · 3 × Fixings & sundries allowance · Installation, testing & commissioning (36 hrs)
$12,353.46
Regional mobilisation — 2-person crew
· Installation, testing & commissioning (16 hrs)
$3,120.00
Subtotal (ex GST)$15,473.46
GST 10%$1,547.35
Total (inc GST)$17,020.81
This quotation is valid for 30 days. Prices are based on supplier costs on 20 Feb 2026. Exclusions: Builder's works, penetrations through fire-rated elements, after-hours work unless noted, structural certification. Flights and camp accommodation supplied by client on remote sites. Payment terms per our account terms. All work carried out by ARCtick-licensed technicians under RTA AU42942 and EC10155.
Heating · Ventilation · Air Conditioning · Refrigeration · Maintenance