Quotation
EST-25-0216 Rev A
Date 14 Dec 2025
Valid until 14 Jan 2026
Prepared by Michelle
Prepared for
Monadelphous Engineering
Attn: Craig Ellery
craig.ellery@monadelphous.com.au
ABN 28 008 988 547
Site
Kwinana fabrication facility
Kwinana
Kwinana fabrication facility — office cassette units
| Description | Amount ex GST |
|---|---|
Ceiling cassette 10 kW — supply & install × 4 4 × Mitsubishi Electric 10.0 kW ceiling cassette (PLA-M100EA) · 4 × Pre-insulated pair coil 3/8" + 5/8" × 20 m · 80 × Interconnect cable 4C 1.5 mm² · 4 × Isolator 20 A 2-pole IP66 · 4 × Condensate pump (mini) · 4 × Condensate drain 20 mm PVC + fittings · 4 × Anti-vibration pads (set of 4) · 4 × Mitsubishi Electric wired controller (PAR-41MAA) · 4 × Fixings & sundries allowance · Installation, testing & commissioning (92 hrs) | $34,066.24 |
| Subtotal (ex GST) | $34,066.24 |
| GST 10% | $3,406.62 |
| Total (inc GST) | $37,472.86 |
This quotation is valid for 30 days. Prices are based on supplier costs on 13 Dec 2025.
Exclusions: Builder's works, penetrations through fire-rated elements, after-hours work unless noted, structural certification. Flights and camp accommodation supplied by client on remote sites.
Payment terms per our account terms. All work carried out by ARCtick-licensed technicians under RTA AU42942 and EC10155.
Heating · Ventilation · Air Conditioning · Refrigeration · Maintenance