WA HVAC

Quotation EST-26-0294

Westgold Resources
MYOB · synced 09:14 Demo 08 Oct 2026
← Back to estimate
WA HVAC — Specialising in Mining & Resources
WA HVAC Pty Ltd
1/9 Blackly Row, Cockburn Central WA 6164 · 08 9314 7696 · admin@wahvac.com.au
ABN 49 629 340 405 · Refrigerant Trading Authorisation AU42942 · Electrical Contractor EC10155
Quotation
EST-26-0294 Rev A
Date 15 Sep 2026
Valid until 16 Oct 2026
Prepared by Michelle
Prepared for
Westgold Resources
Attn: Lisa Carmody
lisa.carmody@westgold.com.au
ABN 60 009 260 306
Site
Bluebird — Meekatharra
Murchison · Meekatharra
Bluebird — switchroom cooling SR-2
DescriptionAmount ex GST
Switchroom cooling — 2 × 7.1 kW duty/standby
2 × Mitsubishi Electric 7.1 kW wall split (MSZ-AP71VG) · 2 × Pre-insulated pair coil 1/4" + 3/8" × 20 m · 2 × Wall bracket 750 mm heavy duty, galv · 2 × Anti-vibration pads (set of 4) · 2 × Isolator 20 A 2-pole IP66 · 30 × Interconnect cable 4C 1.5 mm² · 6 × Conduit 25 mm × 4 m + saddles · 1 × Duty / standby changeover controller with alarm relay · 2 × Condensate drain 20 mm PVC + fittings · 2 × Fixings & sundries allowance · Installation, testing & commissioning (32 hrs)
$10,690.20
Regional mobilisation — 2-person crew
· Installation, testing & commissioning (16 hrs)
$3,120.00
Subtotal (ex GST)$13,810.20
GST 10%$1,381.02
Total (inc GST)$15,191.22
This quotation is valid for 30 days. Prices are based on supplier costs on 14 Sep 2026. Exclusions: Builder's works, penetrations through fire-rated elements, after-hours work unless noted, structural certification. Flights and camp accommodation supplied by client on remote sites. Payment terms per our account terms. All work carried out by ARCtick-licensed technicians under RTA AU42942 and EC10155.
Heating · Ventilation · Air Conditioning · Refrigeration · Maintenance