WA HVAC

Quotation EST-26-0292

Kwinana Bulk Terminal
MYOB · synced 09:14 Demo 08 Oct 2026
← Back to estimate
WA HVAC — Specialising in Mining & Resources
WA HVAC Pty Ltd
1/9 Blackly Row, Cockburn Central WA 6164 · 08 9314 7696 · admin@wahvac.com.au
ABN 49 629 340 405 · Refrigerant Trading Authorisation AU42942 · Electrical Contractor EC10155
Quotation
EST-26-0292 Rev A
Date 11 Sep 2026
Valid until 12 Oct 2026
Prepared by Michelle
Prepared for
Kwinana Bulk Terminal
Attn: Steve Galvin
sgalvin@kbt.com.au
ABN 40 715 228 663
Site
KBT — admin & crib
Kwinana
KBT admin — exhaust & wall split replacement
DescriptionAmount ex GST
Wall split 7.1 kW — back-to-back install × 2
2 × Daikin 7.1 kW wall split inverter (FTXM71) · 2 × Pre-insulated pair coil 1/4" + 3/8" × 20 m · 2 × Wall bracket 750 mm heavy duty, galv · 2 × Anti-vibration pads (set of 4) · 2 × Isolator 20 A 2-pole IP66 · 24 × Interconnect cable 4C 1.5 mm² · 2 × Condensate drain 20 mm PVC + fittings · 2 × Fixings & sundries allowance · Installation, testing & commissioning (24 hrs)
$8,400.94
Exhaust fan & ducting — kitchen / ablutions
1 × Fantech inline mixed-flow fan 250 mm (TD-1300/250) · 2 × Insulated flexible duct 250 mm × 6 m · 2 × Spigot collar 250 mm with damper · 1 × Isolator 20 A 2-pole IP66 · 0.1 × 2.5 mm² TPS cable × 100 m · 1 × Fixings & sundries allowance · Installation, testing & commissioning (13 hrs)
$2,668.65
Subtotal (ex GST)$11,069.59
GST 10%$1,106.96
Total (inc GST)$12,176.55
This quotation is valid for 30 days. Prices are based on supplier costs on 10 Sep 2026. Exclusions: Builder's works, penetrations through fire-rated elements, after-hours work unless noted, structural certification. Flights and camp accommodation supplied by client on remote sites. Payment terms per our account terms. All work carried out by ARCtick-licensed technicians under RTA AU42942 and EC10155.
Heating · Ventilation · Air Conditioning · Refrigeration · Maintenance