WA HVAC Pty Ltd
1/9 Blackly Row, Cockburn Central WA 6164 · 08 9314 7696 · admin@wahvac.com.au
ABN 49 629 340 405 · Refrigerant Trading Authorisation AU42942 · Electrical Contractor EC10155
Quotation
EST-26-0300 Rev A
Date 01 Oct 2026
Valid until 31 Oct 2026
Prepared by Matthew Jacka
Prepared for
Roy Hill Holdings
Attn: Brendan Clancy
brendan.clancy@royhill.com.au
ABN 21 123 722 237
Site
Roy Hill village
Pilbara · mine village
Roy Hill village — donga AC replacement, Block C (24 rooms)
| Description | Amount ex GST |
|---|---|
Donga / transportable split 2.5 kW — per room × 24 24 × Daikin 2.5 kW wall split — transportable/donga (FTXF25) · 12 × Pre-insulated pair coil 1/4" + 3/8" × 20 m · 24 × Wall bracket 750 mm heavy duty, galv · 24 × Isolator 20 A 2-pole IP66 · 192 × Interconnect cable 4C 1.5 mm² · 24 × Condensate drain 20 mm PVC + fittings · 12 × Fixings & sundries allowance · Installation, testing & commissioning (144 hrs) | $45,896.52 |
Regional mobilisation — 2-person crew × 2 · Installation, testing & commissioning (32 hrs) | $6,240.00 |
| Subtotal (ex GST) | $52,136.52 |
| GST 10% | $5,213.65 |
| Total (inc GST) | $57,350.17 |
This quotation is valid for 30 days. Prices are based on supplier costs on 29 Sep 2026.
Exclusions: Builder's works, penetrations through fire-rated elements, after-hours work unless noted, structural certification. Flights and camp accommodation supplied by client on remote sites.
Payment terms per our account terms. All work carried out by ARCtick-licensed technicians under RTA AU42942 and EC10155.
Heating · Ventilation · Air Conditioning · Refrigeration · Maintenance